Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Info

This solution is for P2 Machines

Note

This procedure should ONLY be performed by an authorized Micro-Vu dealer. Please consult your local Micro-Vu authorized sales partner(s) before any operation.

  • Remove the machine Z cover, shroud, lens, and Z drive.

Note

The Z stage will fall, make sure it is held upward firmly by another operator.

  • Remove the M4 Screw hard stop at the top of the travel.

  • There are 8 screws holding the z stage on, 4 in each bearing block. Use 2-4-6 blocks on the glass to support the z stage after it is detached, doing so will avoid the need to undo the igus/cables.

  • Once the screws are out, the old bearing blocks can be removed from the rail at the top of the travel, and new ones can be installed.

Note

The new bearing blocks go on in the right direction: text on the bearing blocks should align with the text on the rail.

Note

The new bearing blocks go on absolutely straight, slight twists can cause bearing balls to fall out of the bearing block.

  • Follow opposite steps to reassemble the machine.

Info

Once the Z-axis being reassembled, it is suggested to re-do the following calibrations/adjustments:

  • Par-focal

  • Par-centric

  • Camera height

  • Camera squareness

  • Ringlight alignment

  • Profile alignment

  • Optics calibration

  • Lights calibration

Detailed instructions on these calibrations/adjustments can be found in the Installation Manuals:

P2 Excel Installation Manual

P2 Vertex User Guide & Installation Manual